Get a Quote
Tell Us What You Need Moved
Waste and recycling requirements can vary from site to site. The easiest way to get started is to send through the key details so the team can review the material type, project location, approximate volume, and timing requirements.
If you are unsure whether your material can be accepted, include as much information as possible and we will help confirm the next step.
Clear Information Helps Avoid Delays
For site managers, project managers, procurement teams, and operations teams, the quote process should not create more work than the waste itself.
Before a load is confirmed, the practical questions are usually the same:
The more clearly these details are supplied, the easier it is to confirm whether Southern Cross Resources SA can assist and what the next step should be.
Project Inquiry
Send through the details below and the team will review your enquiry. If the material, volume, or site requirements need clarification, we may request more information before confirming the next step.
Get In Touch
Materials We Handle
Southern Cross Resources SA can review enquiries for suitable construction, masonry, and demolition-related materials. Final acceptance may depend on material type, condition, contamination, volume, appointment requirements, and compliance requirements.
Concrete
Concrete waste may be suitable for recycling or disposal depending on load condition, composition, and project requirements.
Bricks
Brick and masonry waste can be reviewed for suitable recycling or disposal pathways where load conditions allow.
Roof Tiles
Roof tile materials may be accepted where suitable and subject to condition, composition, and any relevant load requirements.
Pavers
Pavers and related masonry materials can be reviewed for recycling or disposal suitability before booking or arrival.
Masonry Products
Mixed masonry products may be accepted depending on material type, load composition, and compliance requirements.
Bitumen
Bitumen is subject to approval and appointment requirements. Load details should be confirmed before arrival or booking.
Asphalt
Subject to approval and appointment requirements. Please confirm material type, source, and approximate volume first.
Mixed Construction Waste
May be reviewed where compliant. Acceptance depends on material composition and any handling requirements.
What Happens After You Submit an Enquiry
This process helps avoid assumptions around material suitability, load requirements, and site expectations.
1
Submit Your Details
You send through the site, material, volume, and timing details.
2
Enquiry Review
The team reviews whether the enquiry is suitable and whether any further information is required.
3
Material Assessment
If the material or load needs approval, this will be clarified before the job is confirmed.
4
Quote & Next Steps
Once the details are clear, the next step can be discussed or quoted.
Ready to Get Started?
Include your site location, material type, approximate volume, and preferred timing. If you are unsure about any part of the enquiry, include what you know and we will help clarify the rest.



